國立臺北大學loading
國立臺北大學
Loading...
主選單錨點

:::

訊息

GENERAL.
研究發展處訊息

【計畫徵求 Call for Projects】宏匯民生股份有限公司115年研究計畫 Hon Hui Min Sheng Co., Ltd. 2026 Research Project

計畫申請書下載檔案

Application Form (Download

壹、 計畫說明
一、 計畫目的:
國立臺北大學基於推動跨領域之前瞻性創新議題研究,整合大學研究資源與技術,並回應及解決業界實務需求,以促進產業經濟發展,特依「臺北大學民生校區產學合作中心及校友會館新建營運移轉案-開發經營契約」,由宏匯民生股份有限公司提供經費挹注,辦理產學合作研究計畫徵求作業。

Purpose of the Project
Based on the promotion of cross-disciplinary and forward-looking innovative research, the National Taipei University (NTPU) aims to integrate university research resources and technology, respond to and solve practical industry needs, and achieve the goal of promoting industrial economic development. In accordance with the “臺北大學民生校區產學合作中心及校友會館新建營運移轉案-開發經營契約” (the “Contract”), Hon Hui Min Sheng Co., Ltd. provides funding to support this call for industry-academia cooperation research projects.

二、 徵求議題:
議題一:AI代理之跨領域應用

議題二:智慧節能與企業永續
議題三:智慧零售與永續經濟
議題四:人文社會與科技法律
議題五:樂齡人權照護和科技
Topics
Topic 1: Cross-Disciplinary Applications of AI Agents

Topic 2: Smart Energy Saving and Corporate Sustainability
Topic 3: Smart Retail and Sustainable Economy
Topic 4: Humanities, Society, and Technology Law
Topic 5: Senior Rights, Care, and Technology

貳、 計畫申請作業
一、 徵件截止日
收件自即日起至115年3月31日(週二)止
Submission Deadline
No later than March 31, 2026 (Tuesday).
二、 研究團隊組成
(一)由本校跨學院或系所之專任講師以上,或職級相當之研究人員組成研究團隊。計畫應包含至少一位共同主持人(與計畫主持人分屬不同學院或系所),以確保跨領域合作之實質性。

(二)每位申請人(含計畫主持人及共同主持人)於本次徵求中,以申請或參與一案為限。
Research Team Composition
1. The research team shall be composed of full-time lecturers or researchers of equivalent rank or above at NTPU, from different colleges and/or departments.

2. The project must include at least one Co-Principal Investigator (Co-PI) (who belongs to a different college or department from the Principal Investigator) to ensure the substance of cross-disciplinary cooperation.
3. Each applicant (including the PI and Co-PI) is limited to applying for or participating in one project in this call.
三、申請資格
(一)計畫主持人:本校專任講師以上或職級相當之研究人員。
(二)共同主持人:本校專任講師以上或職級相當之研究人員。
(三)協同主持人:不限本校人員,產學合作機構亦得指派有關人員擔任,其資格為公私立大專院校講師職級以上,或職級相當之公私立研究機構研究人員。
(四)校外成員不得超過該研究團隊總人數三分之一。
(五)注意事項
1. 助理人員聘用比照「國家科學及技術委員會補助專題研究計畫研究人力約用注意事項」及其他相關規定辦理。
2. 本計畫產出之研發成果及內容,除著作權歸屬國立臺北大學外,其餘可能獲得之專利權、電路布局權及其他智慧財產權,歸屬雙方共同擁有;其餘未盡事宜應依合約規定履行。
3. 參與產學合作計畫人員之權利義務應依合約等規定履行。
Applicant Qualifications
1. Project Principal Investigator (PI): Full-time lecturers or researchers of equivalent rank or above at NTPU.

2. Co-Principal Investigator (Co-PI): Full-time lecturers or researchers of equivalent rank or above at NTPU.
3. Co-Investigator: Not limited to personnel from NTPU; industry-university cooperation institutions may also appoint relevant personnel. Qualifications include lecturers or researchers of equivalent rank or above at public or private universities or research institutions.
4. Note: External members shall not exceed one-third of the total number of the research team.
Hiring of Assistant Personnel
The hiring of assistant personnel should follow the “National Science and Technology Council's Regulations on Contract Research Personnel in Subsidized Research Projects” and other related regulations.

Intellectual Property Ownership
Copyrights shall belong to National Taipei University. All other intellectual property rights arising from this project, including any patents, circuit layout rights, and other IP rights, shall be jointly owned by both parties. Any matters not addressed herein shall be governed by the Contract.

Rights and Obligations of Project Personnel
The rights and obligations of personnel participating in the industry-academia cooperation project should be performed according to the contract and other regulations.

四、計畫經費編列
(一)每件計畫之經費編列總額以50萬元為上限,並依據審查結果決定實際補助金額。

(二)申請案之計畫編列經費項目:行政管理費依「國立臺北大學產學合作實施辦法」第五條編列;其餘經費依據「行政院所屬各機關行政及政策類委託研究計畫經費編列原則及基準」規定編列。
Project Funding
1. The applied funding for this research project includes operating expenses (including fees for the PI and Co-PI, research personnel, materials, supplies, and miscellaneous costs) and administrative management fees. The subsidy amount will be determined based on the review results. The maximum funding for each project application is limited to 500,000 NTD.

2. Administrative management fees shall be budgeted in accordance with Article 5 of the NTPU Regulations Governing Industry-Academia Collaboration, and other expenses are based on the “Principles and Standards for Budgeting Administrative and Policy Research Projects Commissioned by Executive Yuan Agencies.”

參、申請資料
計畫申請書
(一)依計畫申請書(附件1)規定格式撰寫,並於徵件截止日前,將計畫申請書電子檔案(word和pdf檔案各一份)以電子郵件方式,寄送至信箱vcjiaai@mail.ntpu.edu.tw。

(二)請於計畫申請書基本資料欄位內,填列建議審查委員研究領域與迴避審查委員名單(須敘述迴避理由);本項填列內容僅作為審查作業之參考,承辦單位主管及宏匯民生股份有限公司代表得評估是否採納與迴避。
(三)基本資料填妥後,計畫主持人簽章欄位須附上申請人之電子簽名。
Application Method
1. The application form should be in the specified format (Attachment 1). Before the submission deadline, send the electronic application form files (please provide one copy each in Word and PDF format) via email to the contact person.

2. In the basic information section of the application form, please provide the suggested research fields for the review committee members and a list of reviewers to be avoided (with reasons for avoidance). This information will be used as a reference for the review process, and the responsible unit's supervisor and representatives from Hon Hui Min Sheng Co., Ltd. will evaluate whether to adopt or avoid the suggested reviewers.
3. After completing the basic information, the principal investigator must include their electronic signature in the signature field of the application form.

肆、審查
一、審查程序

(一)初審作業由研究發展處依計畫研究領域,以及參考申請人填列之建議審查委員研究領域與迴避審查委員名單,分送校外專家學者至少2名進行書面審查。同篇研究計畫之外審成績彼此相差15分以上者,則送交第3位外審委員審查,而後剔除極端偏離分數後,取平均值。
(三)複審作業由研究發展處召開審查會議,研究發展處及宏匯民生股份有限公司各派至少1名代表,針對初審結果討論並決議。
Review Procedure
1. Initial review:

The Office of Research and Development (ORD) will assign the proposal to at least two external experts or scholars for written review. The assignment is based on the research field of the project and the applicant's recommended reviewers, as well as the list of reviewers to be avoided. If the scores given by the two external reviewers differ by more than 15 points, a third external reviewer will be brought in for review. The final score will be the average after excluding the most deviant score.
2. Secondary review:
ORD will convene a review meeting for the secondary review. At least one representative from ORD and Hon Hui Min Sheng Co., Ltd. will participate in the discussion and decision based on the preliminary review results.
二、計畫審查重點
(一)計畫團隊應提出未來關鍵研究主題規劃及範疇,且產學合作計畫內容須以本案第壹點第二項所列之議題研究為主。
(二)計畫團隊研究群之執行能力、過去執行產學合作計畫之績效、預期研究成果等。
(三)計畫團隊應鼓勵學生參與本計畫,以促進人才培育、學用合一為目標,提供學生執行產學合作機會。
(四)研究項目及經費規劃使用合理性。
(五)其他吸引產業投入經費之相關證明文件。
Critical Points for Project Review
1. The project team should propose key future research topics and scopes, and the content of the industry-academia cooperation project must focus on the topics listed in Section 2 of this document.

2. The project team's execution capabilities, past performance in industry-academia cooperation projects, and expected research outcomes.
3. The project team should encourage student participation in the project to promote talent cultivation and the integration of learning and application, providing students with opportunities to engage in industry-academia cooperation.
4. The review also considers the rationality of the research items and the planning and use of funds.
5. Supporting documents that may help attract industry funding are welcome.

伍、計畫補助期限與執行需求
一、計畫補助期程

自115年8月1日起至116年7月31日止。
Execution Schedule
From August 1, 2026, to July 31, 2027.
二、經核定通過補助之研究計畫,須於收受核定通知函後,簽署本校產學合作計畫申請表與本校產學合作計畫合約書。
三、計畫執行成果
(一)獲補助之計畫應於計畫執行第6個月期間(116/1/1- 1/31)繳交期中報告電子檔1份至研究發展處備查。
(二)於計畫執行期滿後3個月內,應研發處安排,參加年度計畫成果發表會,並繳交研究成果報告電子檔1份至研究發展處進行審查結案。
Project Execution Outcomes
1. Upon receiving the funding approval notification, the PI shall sign must sign the university's Industry-Academia Collaboration Project Application Form and the Industry-Academia Collaboration Project Contract.

2. Projects that receive funding must submit an electronic version of a mid-term report to ORD for record-keeping during the sixth month of the project (January 1 to January 31, 2027).
3. Within three months after the project period ends, participants must attend the annual project results presentation, as arranged by ORD, and submit an electronic version of the research results report for review and project closure.

陸、新年度補助經費申請之成果考核依據
受補助團隊於計畫執行完畢兩年內至少有一篇與團隊研究內容相關之文章被接受或刊登於「國立臺北大學學術研究獎助辦法」所列資料庫收錄之期刊,並檢附證明文件。文章需註明國立臺北大學及校內補助編號。

Performance Assessment Criteria for Future Grant Applications
Each granted team must have at least one paper related to the research topic of the granted project accepted or published in an academic journal within two years after the completion of the project. The academic journal must be indexed in the database listed in the “Regulations Governing Awards for Academic Research of NTPU”. The accepted or published paper must indicate receiving support from National Taipei University and the NTPU grant number. A proof of paper acceptance or publication must be provided.

柒、聯絡人
林佳艾 vcjiaai@mail.ntpu.edu.tw 研究發展處 新創產學發展中心

Lin Jia-Ai
vcjiaai@mail.ntpu.edu.tw
Center for Innovation, Entrepreneurship, and Industry Collaboration Development, ORD.